- Published at
- by enr.com
positive
positive
Record-setting Tunnel Under the Alps Reaches Interim Milestone
An excavator recently broke through a wall separating two sections of the $9.6-billion Brenner Base Tunnel, creating a 24.1 km continuous bore from the south portal at Fortezza to the Austrian border.